The BioLynceus Story

BioLynceus Water  Remediation Products

Municipal Waste and Industrial Waste Water Treatment

H2S Solution

Fresh Water and Wetland Remediation and Restoration

Treatment for Septic Tank Sludge Removal

Refinery Sludge Remediation

Animal Waste Treatment  Dairy Lagoon Waste Treatments

BioLynceus Soil Remediation Products

Reclamation of Contaminated Soils

Treatment for Disturbed Soils & Terrain

Reclamation of Mining and Disturbed Soils

Soil Conditioning

BioLynceus products for plant growth and root zone development

Agriculture, Farmers and Growers

Solutions for Organic Growers

Products for Golf Course Turf Management

Products for Sports Turf, Parks & Recreation

Solutions for Turf Growers

BioLynceus Consulting Services

Contact BioLynceus

BioLynceus Company Profile

BioLynceus Links to Resources

BioLynceus Provides Speaking



BioLynceus®
Estes Park, CO &
Lyons, CO

970-586-3391 - Phone
303-823-7404

970-577-1387 - Fax

©2009-2013 BioLynceus®

all rights reserved



BHP Pinto Valley Operations Copper Mine Tailing Project - Miami, Arizona

This mining operaiton requires over 1,000,00 tons of ore every week. The majority of the ore is granite and other minerals. Less than one percent is copper, usually the grade runs from 0.2 to 0.4 percent. The ore is crushed and mineral extracted. This requires that about a million tons of mine tailings be stored per week into piles that become large mountains of mine material. This material is sterile of organic material and is difficult to initate or sustain plant growth.

Arizona state law which took effect in 1992 requires that these mining piles either be capped or re-claimed (re-vegetated). Capping has been extremely costly and re-vegetation of the piles has been challenging. Jesse Mitchell, BHP Environmental Technician, has pioneered innovative revegetation programs which have started the process of growing plants on the benign tailings.

Mitchell used the soil remediation products which biologically soften the mine waste material, add carbon and virtually bring life into the material, which otherwise is toxic to plants.

The program demonstrated that propagation of vegetation is possible with soil remediation and pro-organic, pro-biotic programs. Mining operations are looking for economical ways to accomplish the closure requirements of the EPA and the AZDEQ, without costly financial closure expenses. The bio-organic program of BioLynceus provides an economical alternative to help remediate the mine tailings and return the mine material be inhabited by regional vegetation.

The samples below are post application.

Post Treatment Vegetation Growth: Copper Mine Tailings

The case study for this project was written up by Pay Dirt Mining Magazine in December, 1997.

Providing Environmental SolutionsLink to BioLynceus Water Remediation ProductsLink to BioLynceus Soil Remediation ProductsLink to BioLynceus Plant Development ProductsVisit BioLynceus Company Information

Soil Remediation

                                         Copper Tailing Revegetation

  Soil   Sub Menu Navigation   Revegetation   Sub Menu Navigation  Soil Remediation - Copper Tailing Treatment  Sub Menu Navigation  More Photos